Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach

被引:0
|
作者
Bohra P. [1 ]
Verma R.S. [1 ]
机构
[1] Department of Science, Shyam University, Rajasthan, Lalsot, Dausa
关键词
LNSGA-III; Pareto-optimal set; Sustainable construction projects; TCET;
D O I
10.1007/s42107-024-01052-6
中图分类号
学科分类号
摘要
Within the construction project management, environmental concerns often outweigh time and cost considerations. However, with increasing awareness of the air pollution stemming from construction activities, there arises a critical necessity to balance time, cost, and environmental impact (measured in Equivalent-KgCO2). Traditional algorithms have struggled to effectively handle the multitude of non-dominated solutions, leading to a scarcity of better-quality Pareto-optimal solutions. To overcome this challenge, this paper recommends a novel methodology employing the Non-dominated Sorting Genetic Algorithm III (NSGA-III) to construct a model for optimizing the trade-off between time, cost, and environmental impact in construction projects. Latin Hypercube Sampling (LHS) is incorporated into NSGA III for population initialization, resulting in the development of LNSGA III. The developed LNSGA III model aims to efficiently navigate the intricate trade-offs inherent in construction projects. The efficiency of the proposed method is demonstrated by solving a case study project, which generates an exhaustive set of Pareto-optimal solutions. A comparison with existing algorithms demonstrates the superiority of LNSGA III. These solutions provide decision-makers with the flexibility to select the most suitable and sustainable options for activities execution based on their expertise and project-specific considerations. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:4343 / 4354
页数:11
相关论文
共 50 条
  • [1] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [2] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [3] Application of fuzzy BWM-CoCoSo to time-cost-environmental impact trade-off construction project scheduling problem
    Banihashemi, S. A.
    Khalilzadeh, M.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2023, 20 (02) : 1199 - 1214
  • [4] Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development
    Amir Prasad Behera
    Mayank Chauhan
    Gaurav Shrivastava
    Prachi Singh
    Jyoti Shukla
    Krushna Chandra Sethi
    Asian Journal of Civil Engineering, 2025, 26 (1) : 73 - 87
  • [5] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [6] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [7] A sustainable method for optimizing product design with trade-off between life cycle cost and environmental impact
    Mariam Ameli
    Saeed Mansour
    Amir Ahmadi-Javid
    Environment, Development and Sustainability, 2017, 19 : 2443 - 2456
  • [8] A sustainable method for optimizing product design with trade-off between life cycle cost and environmental impact
    Ameli, Mariam
    Mansour, Saeed
    Ahmadi-Javid, Amir
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2017, 19 (06) : 2443 - 2456
  • [9] Optimizing of Discrete Time- cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
    Albayrak, Gulcag
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2023, 67 (03): : 806 - 818
  • [10] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100