Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach

被引:0
|
作者
S. A. Banihashemi
Mohammad Khalilzadeh
A. Shahraki
M. Rostami Malkhalifeh
S. S. R. Ahmadizadeh
机构
[1] Islamic Azad University,Department of Industrial Engineering, Science and Research Branch
[2] University of Sistan and Baluchestan,Department of Industrial Engineering
[3] Islamic Azad University,Department of Mathematics, Science and Research Branch
[4] University of Birjand,Department of Environmental Sciences
关键词
Time–cost–quality–environmental impacts trade-off'; Construction projects; Environmental impacts assessment; Leopold matrix; Multi-objective planning;
D O I
暂无
中图分类号
学科分类号
摘要
The construction industry and the implementation of civil projects are considered to be one of the causes of environmental pollution. Given the impacts and pollution created by the implementation of projects, it is necessary to identify the environmental impacts in order to reduce their effects. The purpose of this paper is to present a discrete time–cost–quality–environmental impacts trade-off problem for the construction industry with multiple execution modes for project activities in order to reduce the environmental impacts of the project implementation. A multi-objective planning model was developed in this problem to address the four objectives of minimizing time, cost, and environmental impacts and maximizing quality of the project implementation. Then, the problem was modeled as a single-objective programming model by converting the objective function to a constraint. The Leopold matrix method was used to evaluate environmental impacts. Finally, part of a rural water supply project was used as a practical example to demonstrate the applicability and efficiency of the model. The results of this study showed that the proposed method to optimize the aforementioned objectives is highly efficient, and planning and decision making in the early stages of a project to choose the method of doing the project activities will result in reducing costs, time, environmental impacts, and enhancing the quality of the project. By calculating the environmental impacts of project activities in each execution mode, project managers and stakeholders can take into account the environment around them, along with pursuing the economic, time, and quality objectives of the project, and minimize the project overall negative environmental impacts as a measurable amount. This research can help project managers choose the most appropriate method to execute their activities so that the project will ultimately be delivered with the least amount of time, cost, and environmental impact, and with the highest quality.
引用
收藏
页码:631 / 646
页数:15
相关论文
共 50 条
  • [1] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [2] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [3] Development of time–cost trade-off optimization model for construction projects with MOPSO technique
    Agarwal A.K.
    Chauhan S.S.
    Sharma K.
    Sethi K.C.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4529 - 4539
  • [4] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
  • [5] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [6] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [7] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [8] Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach
    Bohra P.
    Verma R.S.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 4343 - 4354
  • [9] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [10] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects
    Mendomo Meye, Serges
    Li, Guowei
    Shen, Zhenzhong
    Zhang, Jingbin
    APPLIED SCIENCES-BASEL, 2022, 12 (12):