共 23 条
- [1] VANHOUCKE M., New computational results for the discrete time/cost trade-off problem with time-switch constraints [J], European Journal of Operational Research, 165, 2, pp. 359-374, (2005)
- [2] ARDITI D., Overview of multi-objective optimization approaches in construction project management, Multicriteria Optimization-Pareto-Optimality and Threshold-Optimality, (2020)
- [3] A dynamic programming algorithm for decision CPM networks[J], Operations Research, 27, 2, pp. 225-241, (1979)
- [4] Network decomposition-based benchmark results for the discrete time-cost tradeoff problem[J], European Journal of Operational Research, 165, 2, pp. 339-358, (2005)
- [5] Discrete time/cost trade-off problem:a decomposition-based solution algorithm for the budget version[J], Computers and Operations Research, 37, 4, pp. 649-655, (2010)
- [6] GEEM Z W., Multiobjective optimization of time-cost trade-off using harmony search[J], Journal of Construction Engineering and Management, 136, 6, pp. 711-716, (2010)
- [7] ZHUO J S, LU H M., A multi-objective optimization of construction projects based on particle swarm algorithm, Journal of Engineering Management, 31, 6, pp. 101-106, (2017)
- [8] LI Y C, WANG S R,, HE Y S., Multi-objective optimization of construction project based on improved ant colony algorithm[J], Tehnicki Vjesnik, 27, 1, pp. 184-190, (2020)
- [9] FENG C W,, LIU L, BURNS S A., Using genetic algorithms to solve construction time-cost trade-off problems[J]., Journal of Computing in Civil Engineering, 11, 3, pp. 184-189, (1997)
- [10] YANG I T, LEE H Y., Use of support vector regression to improve computational efficiency of stochastic time-cost tradeoff, Journal of Construction Engineering and Management, 140, 1, (2014)