Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach

被引:0
|
作者
S. A. Banihashemi
Mohammad Khalilzadeh
A. Shahraki
M. Rostami Malkhalifeh
S. S. R. Ahmadizadeh
机构
[1] Islamic Azad University,Department of Industrial Engineering, Science and Research Branch
[2] University of Sistan and Baluchestan,Department of Industrial Engineering
[3] Islamic Azad University,Department of Mathematics, Science and Research Branch
[4] University of Birjand,Department of Environmental Sciences
关键词
Time–cost–quality–environmental impacts trade-off'; Construction projects; Environmental impacts assessment; Leopold matrix; Multi-objective planning;
D O I
暂无
中图分类号
学科分类号
摘要
The construction industry and the implementation of civil projects are considered to be one of the causes of environmental pollution. Given the impacts and pollution created by the implementation of projects, it is necessary to identify the environmental impacts in order to reduce their effects. The purpose of this paper is to present a discrete time–cost–quality–environmental impacts trade-off problem for the construction industry with multiple execution modes for project activities in order to reduce the environmental impacts of the project implementation. A multi-objective planning model was developed in this problem to address the four objectives of minimizing time, cost, and environmental impacts and maximizing quality of the project implementation. Then, the problem was modeled as a single-objective programming model by converting the objective function to a constraint. The Leopold matrix method was used to evaluate environmental impacts. Finally, part of a rural water supply project was used as a practical example to demonstrate the applicability and efficiency of the model. The results of this study showed that the proposed method to optimize the aforementioned objectives is highly efficient, and planning and decision making in the early stages of a project to choose the method of doing the project activities will result in reducing costs, time, environmental impacts, and enhancing the quality of the project. By calculating the environmental impacts of project activities in each execution mode, project managers and stakeholders can take into account the environment around them, along with pursuing the economic, time, and quality objectives of the project, and minimize the project overall negative environmental impacts as a measurable amount. This research can help project managers choose the most appropriate method to execute their activities so that the project will ultimately be delivered with the least amount of time, cost, and environmental impact, and with the highest quality.
引用
收藏
页码:631 / 646
页数:15
相关论文
共 50 条
  • [21] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [22] Time-Profit Trade-Off Analysis for Construction Projects
    Senouci, Ahmed
    El-Rayes, Khaled
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (08): : 718 - 725
  • [23] A time - Cost trade-off algorithm for nonserial linear projects
    Senouci, AB
    Eldin, NN
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (01) : 134 - 149
  • [24] Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Hatamleh, Muhammad T.
    Song, Siyuan
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [25] Time-Quality-Cost Trade-Off Optimization and Application in Engineering Project
    Dong Na
    Liang Chuan
    Guo Chun-xiang
    Zou Zuo-jing
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1597 - +
  • [26] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects
    Gülçağ Albayrak
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
  • [27] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [28] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
  • [29] Time-cost trade-off optimization with a new initial population approach
    Toğan V.
    Eirgash M.A.
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2019, 30 (06): : 9561 - 9580
  • [30] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697