Time-cost trade-off optimization with a new initial population approach

被引:0
|
作者
Toğan V. [1 ]
Eirgash M.A. [1 ]
机构
[1] Karadeniz Technical University, Department of Civil Engineering, Trabzon
关键词
Construction project; Metaheuristic algorithm; Multi-objective optimization; Time-cost trade-off problem;
D O I
10.18400/TEKDERG.410934
中图分类号
学科分类号
摘要
Completion of a project on time is crucial for its stakeholders when the competitive environment in all industries is considered. This favorable target is achieved by finding the optimal set of time-cost alternatives, which is known as time-cost trade-off problem (TCTP) in the literature. In this study, a new initial population approach is presented to improve the quality of the optimal set of time-cost alternatives. It employs a predefined number of solutions to the single objective TCTP into the initial population of teaching learning-based algorithm, which is an optimizer for the multi-objective optimization of TCTP. Hence, it is aimed at descending randomness on the initial population and decreasing searching effort to catch the optimal set of time-cost alternatives in the search space. The proposed methodology is tested on a series of benchmark problems and the solutions obtained are compared with those available in the technical literature. Results show that the present method can produce favorable solutions as effective as other techniques applied for simultaneous optimization of TCTPs. © 2019 Turkish Chamber of Civil Engineers. All rights reserved.
引用
收藏
页码:9561 / 9580
页数:19
相关论文
共 50 条
  • [1] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
  • [2] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [3] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [4] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [5] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [6] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [7] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [8] Project time-cost trade-off optimization by maximal flow theory
    Liu, JM
    Rahbar, F
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 607 - 609
  • [9] A new approach to solve time-cost trade-off problem with fuzzy decision variables
    Ghazanfari, M.
    Yousefli, A.
    Ameli, M. S. Jabal
    Bozorgi-Amiri, A.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 408 - 414
  • [10] A genetic algorithm approach for the time-cost trade-off in PERT networks
    Azaron, A
    Perkgoz, C
    Sakawa, M
    APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) : 1317 - 1339