A time - Cost trade-off algorithm for nonserial linear projects

被引:13
|
作者
Senouci, AB
Eldin, NN
机构
[1] Department of Civil Engineering, Oregon State University, Corvallis
关键词
time-cost trade-off; linear projects; planning and scheduling; project control; project management; nonserial linear projects;
D O I
10.1139/l96-014
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the last decade, a number of methods based on the theories of linear and dynamic programming were developed for the scheduling of linear projects. However, these methods are only capable of handling sequential or serial activities. In this paper, a dynamic programming formulation for the scheduling of nonsequential or nonserial activities is presented. The objective of the current formulation is to determine the project time-cost profile, which determines possible project durations and their minimum project total costs. The formulation considers the effects of crew formations, interruptions, and lags for production activities in determining the minimum project total cost, minimum project direct cost, and minimum project duration. In addition, the approach presented is capable of handling activity durations and interruptions described by continuous and discrete functions. The formulation is also capable of handling both serial and nonserial linear projects. An example project is provided to illustrate the computational steps, validate the calculation algorithm, and show the capabilities of the proposed method.
引用
收藏
页码:134 / 149
页数:16
相关论文
共 50 条
  • [1] Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming
    Elkalla I.
    Elbeltagi E.
    El Shikh M.
    Journal of The Institution of Engineers (India): Series A, 2021, 102 (1) : 267 - 278
  • [2] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [3] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [4] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects
    Bragadin, Marco Alvise
    Pozzi, Luca
    Kahkonen, Kalle
    SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
  • [5] Adaptive opposition slime mold algorithm for time–cost–quality–safety trade-off for construction projects
    Son P.V.H.
    Khoi L.N.Q.
    Asian Journal of Civil Engineering, 2023, 24 (7) : 1927 - 1942
  • [6] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [7] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [8] Automated trade-off between time and cost in planning repetitive construction projects
    Hyari, Khalied Hesham
    El-Rayes, Khaled
    El-Mashaleh, Mohammad
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (08) : 749 - 761
  • [9] Optimizing of Discrete Time- cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
    Albayrak, Gulcag
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2023, 67 (03): : 806 - 818
  • [10] Development of time–cost trade-off optimization model for construction projects with MOPSO technique
    Agarwal A.K.
    Chauhan S.S.
    Sharma K.
    Sethi K.C.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4529 - 4539