Factors affecting time and cost trade-off in multiple construction projects

被引:3
|
作者
Hasan, Musaab Falih [1 ]
Mohammed, Sawsan Rasheed [1 ]
机构
[1] Univ Baghdad, Coll Engn, Dept Civil Engn, Baghdad, Iraq
关键词
trade-off; construction projects; cash flow; relative importance index;
D O I
10.24425/ace.2022.140658
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cash is one of the most critical resources of a construction company that determines survival. Cash-flow management is essential for contractors, as lack of cash resources is one of the leading causes of bankruptcy in the construction industry, compared to most other sectors. The purpose of this paper is to identify factors affecting time and cost trade-off in multiple construction projects in Iraq. After reviewing a wide range of literature to determine the most common elements, a questionnaire is distributed to owners, consultants, supervising engineers, and contractors engaged in construction projects. The results of the questionnaire were analyzed using the relative importance index, arithmetic mean and standard deviation. The respondents namely assured Seventeen most essential factors; payments delay from client, progress payment due period, payment conditions, advanced payment, project delay, inaccurate project scheduling, variation orders, project duration, inaccurate project duration, profit, risk margin, project cost, cash flow forecasts, retentions percentage, estimating errors, materials cost, equipment cost, and labour cost.
引用
收藏
页码:549 / 561
页数:13
相关论文
共 50 条
  • [1] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [2] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [3] Automated trade-off between time and cost in planning repetitive construction projects
    Hyari, Khalied Hesham
    El-Rayes, Khaled
    El-Mashaleh, Mohammad
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (08) : 749 - 761
  • [4] Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming
    Elkalla I.
    Elbeltagi E.
    El Shikh M.
    Journal of The Institution of Engineers (India): Series A, 2021, 102 (1) : 267 - 278
  • [5] Development of time–cost trade-off optimization model for construction projects with MOPSO technique
    Agarwal A.K.
    Chauhan S.S.
    Sharma K.
    Sethi K.C.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4529 - 4539
  • [6] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [7] Time-Profit Trade-Off Analysis for Construction Projects
    Senouci, Ahmed
    El-Rayes, Khaled
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (08): : 718 - 725
  • [8] A time - Cost trade-off algorithm for nonserial linear projects
    Senouci, AB
    Eldin, NN
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (01) : 134 - 149
  • [9] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [10] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects
    Gülçağ Albayrak
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307