Factors affecting time and cost trade-off in multiple construction projects

被引:3
|
作者
Hasan, Musaab Falih [1 ]
Mohammed, Sawsan Rasheed [1 ]
机构
[1] Univ Baghdad, Coll Engn, Dept Civil Engn, Baghdad, Iraq
关键词
trade-off; construction projects; cash flow; relative importance index;
D O I
10.24425/ace.2022.140658
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cash is one of the most critical resources of a construction company that determines survival. Cash-flow management is essential for contractors, as lack of cash resources is one of the leading causes of bankruptcy in the construction industry, compared to most other sectors. The purpose of this paper is to identify factors affecting time and cost trade-off in multiple construction projects in Iraq. After reviewing a wide range of literature to determine the most common elements, a questionnaire is distributed to owners, consultants, supervising engineers, and contractors engaged in construction projects. The results of the questionnaire were analyzed using the relative importance index, arithmetic mean and standard deviation. The respondents namely assured Seventeen most essential factors; payments delay from client, progress payment due period, payment conditions, advanced payment, project delay, inaccurate project scheduling, variation orders, project duration, inaccurate project duration, profit, risk margin, project cost, cash flow forecasts, retentions percentage, estimating errors, materials cost, equipment cost, and labour cost.
引用
收藏
页码:549 / 561
页数:13
相关论文
共 50 条
  • [21] Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach
    Bohra P.
    Verma R.S.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 4343 - 4354
  • [22] Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Hatamleh, Muhammad T.
    Song, Siyuan
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [23] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [24] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [25] Opposition-Based Multiple-Objective Differential Evolution to Solve the Time-Cost-Environment Impact Trade-Off Problem in Construction Projects
    Cheng, Min-Yuan
    Duc-Hoc Tran
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2015, 29 (05)
  • [26] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321
  • [27] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects
    Mendomo Meye, Serges
    Li, Guowei
    Shen, Zhenzhong
    Zhang, Jingbin
    APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [28] A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development
    Hashemi, Reza
    Shahbandarzadeh, Hamid
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 323 - 330
  • [29] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [30] A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects
    Monghasemi, Shahryar
    Nikoo, Mohammad Reza
    Fasaee, Mohammad Ali Khaksar
    Adamowski, Jan
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3089 - 3104