共 50 条
- [6] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
- [7] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
- [8] Study on trade-off of time-cost-quality in construction project based on BIM PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
- [9] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction PLOS ONE, 2016, 11 (12):
- [10] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308