Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach

被引:36
|
作者
Banihashemi, S. A. [1 ]
Khalilzadeh, Mohammad [1 ]
Shahraki, A. [2 ]
Malkhalifeh, M. Rostami [3 ]
Ahmadizadeh, S. S. R. [4 ]
机构
[1] Islamic Azad Univ, Dept Ind Engn, Sci & Res Branch, Tehran, Iran
[2] Univ Sistan & Baluchestan, Dept Ind Engn, Zahedan, Iran
[3] Islamic Azad Univ, Dept Math, Sci & Res Branch, Tehran, Iran
[4] Univ Birjand, Dept Environm Sci, Birjand, Iran
关键词
Time-cost-quality-environmental impacts trade-off'; Construction projects; Environmental impacts assessment; Leopold matrix; Multi-objective planning; GREENHOUSE-GAS EMISSIONS; MULTIOBJECTIVE OPTIMIZATION; DISCRETE-TIME; CO2; EMISSION; REDUCTION; HEALTH; MODES; GOALS;
D O I
10.1007/s13762-020-02838-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The construction industry and the implementation of civil projects are considered to be one of the causes of environmental pollution. Given the impacts and pollution created by the implementation of projects, it is necessary to identify the environmental impacts in order to reduce their effects. The purpose of this paper is to present a discrete time-cost-quality-environmental impacts trade-off problem for the construction industry with multiple execution modes for project activities in order to reduce the environmental impacts of the project implementation. A multi-objective planning model was developed in this problem to address the four objectives of minimizing time, cost, and environmental impacts and maximizing quality of the project implementation. Then, the problem was modeled as a single-objective programming model by converting the objective function to a constraint. The Leopold matrix method was used to evaluate environmental impacts. Finally, part of a rural water supply project was used as a practical example to demonstrate the applicability and efficiency of the model. The results of this study showed that the proposed method to optimize the aforementioned objectives is highly efficient, and planning and decision making in the early stages of a project to choose the method of doing the project activities will result in reducing costs, time, environmental impacts, and enhancing the quality of the project. By calculating the environmental impacts of project activities in each execution mode, project managers and stakeholders can take into account the environment around them, along with pursuing the economic, time, and quality objectives of the project, and minimize the project overall negative environmental impacts as a measurable amount. This research can help project managers choose the most appropriate method to execute their activities so that the project will ultimately be delivered with the least amount of time, cost, and environmental impact, and with the highest quality.
引用
收藏
页码:631 / 646
页数:16
相关论文
共 50 条
  • [1] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [2] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [3] Time-cost-quality trade-off analysis for highway construction
    El-Rayes, K
    Kandil, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) : 477 - 486
  • [4] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects
    Mendomo Meye, Serges
    Li, Guowei
    Shen, Zhenzhong
    Zhang, Jingbin
    APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [5] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [6] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach
    Hosny, Ossama
    Elbassuony, Mahmoud
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
  • [7] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [8] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
    Fu, Fang
    Zhang, Tao
    PLOS ONE, 2016, 11 (12):
  • [9] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [10] CONSTRUCTION MATERIALS-BASED METHODOLOGY FOR TIME-COST-QUALITY TRADE-OFF PROBLEMS
    Kazaz, Aynur
    Ulubeyli, Serdar
    Bayram, E. R.
    Acikara, Turgut
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 35 - 41