Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach

被引:36
|
作者
Banihashemi, S. A. [1 ]
Khalilzadeh, Mohammad [1 ]
Shahraki, A. [2 ]
Malkhalifeh, M. Rostami [3 ]
Ahmadizadeh, S. S. R. [4 ]
机构
[1] Islamic Azad Univ, Dept Ind Engn, Sci & Res Branch, Tehran, Iran
[2] Univ Sistan & Baluchestan, Dept Ind Engn, Zahedan, Iran
[3] Islamic Azad Univ, Dept Math, Sci & Res Branch, Tehran, Iran
[4] Univ Birjand, Dept Environm Sci, Birjand, Iran
关键词
Time-cost-quality-environmental impacts trade-off'; Construction projects; Environmental impacts assessment; Leopold matrix; Multi-objective planning; GREENHOUSE-GAS EMISSIONS; MULTIOBJECTIVE OPTIMIZATION; DISCRETE-TIME; CO2; EMISSION; REDUCTION; HEALTH; MODES; GOALS;
D O I
10.1007/s13762-020-02838-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The construction industry and the implementation of civil projects are considered to be one of the causes of environmental pollution. Given the impacts and pollution created by the implementation of projects, it is necessary to identify the environmental impacts in order to reduce their effects. The purpose of this paper is to present a discrete time-cost-quality-environmental impacts trade-off problem for the construction industry with multiple execution modes for project activities in order to reduce the environmental impacts of the project implementation. A multi-objective planning model was developed in this problem to address the four objectives of minimizing time, cost, and environmental impacts and maximizing quality of the project implementation. Then, the problem was modeled as a single-objective programming model by converting the objective function to a constraint. The Leopold matrix method was used to evaluate environmental impacts. Finally, part of a rural water supply project was used as a practical example to demonstrate the applicability and efficiency of the model. The results of this study showed that the proposed method to optimize the aforementioned objectives is highly efficient, and planning and decision making in the early stages of a project to choose the method of doing the project activities will result in reducing costs, time, environmental impacts, and enhancing the quality of the project. By calculating the environmental impacts of project activities in each execution mode, project managers and stakeholders can take into account the environment around them, along with pursuing the economic, time, and quality objectives of the project, and minimize the project overall negative environmental impacts as a measurable amount. This research can help project managers choose the most appropriate method to execute their activities so that the project will ultimately be delivered with the least amount of time, cost, and environmental impact, and with the highest quality.
引用
收藏
页码:631 / 646
页数:16
相关论文
共 50 条
  • [21] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [22] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [23] Time-cost-quality trade-off model based on genetic algorithms and Pareto ranking
    Chen, Yong-Qiang
    Gao, Ming
    Zhang, Lian-Ying
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (10): : 1774 - 1780
  • [24] Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach
    Bohra P.
    Verma R.S.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 4343 - 4354
  • [25] A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project
    Mungle, Santosh
    Benyoucef, Lyes
    Son, Young-Jun
    Tiwari, M. K.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2013, 26 (08) : 1953 - 1966
  • [26] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [27] Automated trade-off between time and cost in planning repetitive construction projects
    Hyari, Khalied Hesham
    El-Rayes, Khaled
    El-Mashaleh, Mohammad
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (08) : 749 - 761
  • [28] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects
    Bragadin, Marco Alvise
    Pozzi, Luca
    Kahkonen, Kalle
    SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
  • [29] Adaptive opposition slime mold algorithm for time–cost–quality–safety trade-off for construction projects
    Son P.V.H.
    Khoi L.N.Q.
    Asian Journal of Civil Engineering, 2023, 24 (7) : 1927 - 1942
  • [30] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695