Automated trade-off between time and cost in planning repetitive construction projects

被引:47
|
作者
Hyari, Khalied Hesham [1 ]
El-Rayes, Khaled [2 ]
El-Mashaleh, Mohammad [1 ]
机构
[1] Hashemite Univ, Dept Civil Engn, Zarqa 13115, Jordan
[2] Univ Illinois, Civil & Environm Engn, Urbana, IL USA
关键词
Repetitive construction; scheduling; genetic algorithms; optimization; resource utilization;
D O I
10.1080/01446190903117793
中图分类号
F [经济];
学科分类号
02 ;
摘要
An automated model is developed to support the optimization of the planning and scheduling of repetitive construction projects. The model provides the capability of optimizing two important objectives commonly sought in scheduling repetitive construction projects: minimizing project duration; and minimizing project cost. The model performs this multi-objective optimization using a genetic algorithm approach. The output of the model is a set of optimal solutions that represent the trade-off between time and cost in planning repetitive construction projects. Furthermore, the model can be utilized to find a single scheduling solution that provides the minimum overall project cost by simply adding project indirect cost to the obtained project direct cost for each of the obtained scheduling solutions on the Pareto optimal curve. Other important time-related costs are also considered in the model including: early completion incentives, late completion penalties and lane rental costs. Providing the planners of repetitive construction projects with an automated set of optimal time-cost trade-off solutions should contribute to cost-effective and speedy delivery of this type of construction project. An application example is analysed to illustrate the use of the model and demonstrate its capabilities in generating optimal trade-off solutions between minimizing the project time and cost for repetitive construction projects.
引用
收藏
页码:749 / 761
页数:13
相关论文
共 50 条
  • [1] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [2] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [3] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [4] Trade-off between safety and cost in planning construction site layouts
    El-Rayes, K
    Khalafallah, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (11): : 1186 - 1195
  • [5] Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming
    Elkalla I.
    Elbeltagi E.
    El Shikh M.
    Journal of The Institution of Engineers (India): Series A, 2021, 102 (1) : 267 - 278
  • [6] Development of time–cost trade-off optimization model for construction projects with MOPSO technique
    Agarwal A.K.
    Chauhan S.S.
    Sharma K.
    Sethi K.C.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4529 - 4539
  • [7] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [8] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321
  • [9] Time-Profit Trade-Off Analysis for Construction Projects
    Senouci, Ahmed
    El-Rayes, Khaled
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (08): : 718 - 725
  • [10] A time - Cost trade-off algorithm for nonserial linear projects
    Senouci, AB
    Eldin, NN
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (01) : 134 - 149