Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach

被引:0
|
作者
Bohra P. [1 ]
Verma R.S. [1 ]
机构
[1] Department of Science, Shyam University, Rajasthan, Lalsot, Dausa
关键词
LNSGA-III; Pareto-optimal set; Sustainable construction projects; TCET;
D O I
10.1007/s42107-024-01052-6
中图分类号
学科分类号
摘要
Within the construction project management, environmental concerns often outweigh time and cost considerations. However, with increasing awareness of the air pollution stemming from construction activities, there arises a critical necessity to balance time, cost, and environmental impact (measured in Equivalent-KgCO2). Traditional algorithms have struggled to effectively handle the multitude of non-dominated solutions, leading to a scarcity of better-quality Pareto-optimal solutions. To overcome this challenge, this paper recommends a novel methodology employing the Non-dominated Sorting Genetic Algorithm III (NSGA-III) to construct a model for optimizing the trade-off between time, cost, and environmental impact in construction projects. Latin Hypercube Sampling (LHS) is incorporated into NSGA III for population initialization, resulting in the development of LNSGA III. The developed LNSGA III model aims to efficiently navigate the intricate trade-offs inherent in construction projects. The efficiency of the proposed method is demonstrated by solving a case study project, which generates an exhaustive set of Pareto-optimal solutions. A comparison with existing algorithms demonstrates the superiority of LNSGA III. These solutions provide decision-makers with the flexibility to select the most suitable and sustainable options for activities execution based on their expertise and project-specific considerations. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:4343 / 4354
页数:11
相关论文
共 50 条
  • [41] Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Hatamleh, Muhammad T.
    Song, Siyuan
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [42] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [43] A reduction tree approach for the Discrete Time/Cost Trade-Off Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2022, 143
  • [44] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [45] Opposition-Based Multiple-Objective Differential Evolution to Solve the Time-Cost-Environment Impact Trade-Off Problem in Construction Projects
    Cheng, Min-Yuan
    Duc-Hoc Tran
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2015, 29 (05)
  • [46] Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration
    Zou, Xin
    Fang, Shu-Cherng
    Huang, Yuan-Sheng
    Zhang, Li-Hui
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (03)
  • [47] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321
  • [48] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects
    Mendomo Meye, Serges
    Li, Guowei
    Shen, Zhenzhong
    Zhang, Jingbin
    APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [49] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [50] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO
    Arlbayrak, Gulcag
    Ozdemir, Ilker
    REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318