Project time–cost trade-off scheduling: a hybrid optimization approach

被引:0
|
作者
Hadi Mokhtari
Abdollah Aghaie
Javad Rahimi
Ashkan Mozdgir
机构
[1] K.N. Toosi University of Technology,Industrial Engineering Department
[2] Mazandaran University of Science and Technology,Industrial Engineering Department
关键词
Project scheduling; Time–cost trade-off; Hybrid approach; Cutting plane; Optimization;
D O I
暂无
中图分类号
学科分类号
摘要
This paper develops a hybrid approach for stochastic time–cost trade-off problem (STCTP) in PERT networks of project management, where activities are subjected to linear cost functions. The main objective of proposed approach is to improve the project completion probability in a prespecified deadline from a risky value to a confident predefined probability. To this end, we construct a nonlinear mathematical program with decision variables of activity mean durations, in which the objective function is concerned with minimization of project crashing direct cost. In order to solve the constructed model, we present a hybrid approach based on cutting plane method and Monte Carlo (MC) simulation. To illustrate the process of proposed approach, the approach was coded using MATLAB 7.6.0 and two illustrative examples are discussed. The results obtained from the computational study show that the proposed algorithm is an effective approach for the STCTP.
引用
收藏
页码:811 / 822
页数:11
相关论文
共 50 条
  • [1] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [2] A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling
    Pawinski, Grzegorz
    Sapiecha, Krzysztof
    FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 171 - 179
  • [3] Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling
    Tiwari S.
    Johari S.
    Journal of The Institution of Engineers (India): Series A, 2015, 96 (1) : 37 - 46
  • [4] Trade-off between time and cost in project planning: a simulation-based optimization approach
    Senses, Sena
    Kumral, Mustafa
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2024, 100 (02): : 127 - 143
  • [5] Developing an optimization financing cost-scheduling trade-off model in construction project
    Tavakolan, Mehdi
    Nikoukar, Shayan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (02) : 262 - 277
  • [6] A hybrid simulation-optimization approach for the robust Discrete Time/Cost Trade-off Problem
    Said, Samer S.
    Haouari, Mohamed
    APPLIED MATHEMATICS AND COMPUTATION, 2015, 259 : 628 - 636
  • [7] Time-Quality-Cost Trade-Off Optimization and Application in Engineering Project
    Dong Na
    Liang Chuan
    Guo Chun-xiang
    Zou Zuo-jing
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1597 - +
  • [8] Project time-cost trade-off optimization by maximal flow theory
    Liu, JM
    Rahbar, F
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 607 - 609
  • [9] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
  • [10] A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
    Ranjbar, Mohammad
    De Reyck, Bert
    Kianfar, Fereydoon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (01) : 35 - 48