摘要
This paper develops a hybrid approach for stochastic time–cost trade-off problem (STCTP) in PERT networks of project management, where activities are subjected to linear cost functions. The main objective of proposed approach is to improve the project completion probability in a prespecified deadline from a risky value to a confident predefined probability. To this end, we construct a nonlinear mathematical program with decision variables of activity mean durations, in which the objective function is concerned with minimization of project crashing direct cost. In order to solve the constructed model, we present a hybrid approach based on cutting plane method and Monte Carlo (MC) simulation. To illustrate the process of proposed approach, the approach was coded using MATLAB 7.6.0 and two illustrative examples are discussed. The results obtained from the computational study show that the proposed algorithm is an effective approach for the STCTP.
引用
收藏
页码:811 / 822
页数:11
相关论文
共 50 条
  • [31] A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
    Klerides, E.
    Hadjiconstantinou, E.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (12) : 2131 - 2140
  • [32] Discrete time/cost trade-off project scheduling problem with tardiness bounds - an application to the Ministry of Health in Turkey
    Akbudak, Ozlem
    Karakaya, Gulsah
    Azizoglu, Meral
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2025, 19 (02)
  • [33] A Genetic Algorithm to Time- Cost Trade off in Project Scheduling
    Hooshyar, B.
    Rahmani, A.
    Shenasa, M.
    2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 3081 - +
  • [34] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306
  • [35] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [36] Time and cost trade-off heuristics for workflow scheduling based on bottom level
    Liu, Cancan
    Zhang, Weimin
    Luo, Zhigang
    Guofang Keji Daxue Xuebao/Journal of National University of Defense Technology, 2013, 35 (03): : 61 - 66
  • [37] Time and cost trade-off management for scheduling parallel applications on Utility Grids
    Garg, Saurabh Kumar
    Buyya, Rajkumar
    Siegel, Howard Jay
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF GRID COMPUTING-THEORY METHODS AND APPLICATIONS, 2010, 26 (08): : 1344 - 1355
  • [38] Robust optimization models for the discrete time/cost trade-off problem
    Hazir, Oncu
    Erel, Erdal
    Gunalay, Yavuz
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 130 (01) : 87 - 95
  • [39] Robust scheduling and robustness measures for the discrete time/cost trade-off problem
    Hazir, Oencue
    Haouari, Mohamed
    Erel, Erdal
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (02) : 633 - 643
  • [40] Time/resource trade-off in the robust optimization of resource-constraint project scheduling problem under uncertainty
    Zhang, Zhe
    Zhong, Xuejuan
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (04) : 243 - 254