A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling

被引:0
|
作者
Pawinski, Grzegorz [1 ]
Sapiecha, Krzysztof [2 ]
机构
[1] Kielce Univ Technol, Dept Comp Sci, PL-25314 Kielce, Poland
[2] Cracow Univ Technol, Fac Elect & Comp Engn, PL-31155 Krakow, Poland
关键词
ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, the use of Developmental Genetic Programming (DGP) for solving a new extension of the Resource-Constrained Project Scheduling Problem (RCPSP) is investigated. We consider a variant of the problem when resources are only partially available and a deadline is given but it is the cost of the project that should be minimized. RCPSP is a well-known NP-hard problem but in its original formulation it does not take into consideration initial resource workload and it minimises the makespan. Unlike other genetic approaches, where genotypes represent solutions, a genotype in DGP is a procedure that constructs a solution to the problem. Genotypes (the search space) and phenotypes (the solution space) are distinguished and a genotype-to-phenotype mapping (GPM) is used. Thus, genotypes are evolved without any restrictions and the whole search space is explored. The goal of the evolution is to find a procedure constructing the best solution of the problem for which the cost of the project is minimal. The paper presents genetic operators as well as GPM specified for the DGP. Experimental results showed that our approach gives significantly better results compared with methods presented in the literature.
引用
收藏
页码:171 / 179
页数:9
相关论文
共 50 条
  • [1] Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling
    Tiwari S.
    Johari S.
    Journal of The Institution of Engineers (India): Series A, 2015, 96 (1) : 37 - 46
  • [2] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [3] Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (07) : 1979 - 2004
  • [4] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [5] A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
    Zareei, Mostafa
    Hassan-Pour, Hossein Ali
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2015, 8 (04) : 653 - 685
  • [6] Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
    Ranjbar, Mohammad R.
    Kianfar, Fereydoon
    APPLIED MATHEMATICS AND COMPUTATION, 2007, 191 (02) : 451 - 456
  • [7] The trade-off between stability and makespan in resource-constrained project scheduling
    Van De Vonder, S
    Demeulemeester, E
    Herroelen, W
    Leus, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (02) : 215 - 236
  • [8] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [9] Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process
    Sadri, Shadi
    Ghomi, S. M. T. Fatemi
    Dehghanian, Amin
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 535 - 568
  • [10] A Genetic Algorithm to Time- Cost Trade off in Project Scheduling
    Hooshyar, B.
    Rahmani, A.
    Shenasa, M.
    2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 3081 - +