A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling

被引:0
|
作者
Pawinski, Grzegorz [1 ]
Sapiecha, Krzysztof [2 ]
机构
[1] Kielce Univ Technol, Dept Comp Sci, PL-25314 Kielce, Poland
[2] Cracow Univ Technol, Fac Elect & Comp Engn, PL-31155 Krakow, Poland
关键词
ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, the use of Developmental Genetic Programming (DGP) for solving a new extension of the Resource-Constrained Project Scheduling Problem (RCPSP) is investigated. We consider a variant of the problem when resources are only partially available and a deadline is given but it is the cost of the project that should be minimized. RCPSP is a well-known NP-hard problem but in its original formulation it does not take into consideration initial resource workload and it minimises the makespan. Unlike other genetic approaches, where genotypes represent solutions, a genotype in DGP is a procedure that constructs a solution to the problem. Genotypes (the search space) and phenotypes (the solution space) are distinguished and a genotype-to-phenotype mapping (GPM) is used. Thus, genotypes are evolved without any restrictions and the whole search space is explored. The goal of the evolution is to find a procedure constructing the best solution of the problem for which the cost of the project is minimal. The paper presents genetic operators as well as GPM specified for the DGP. Experimental results showed that our approach gives significantly better results compared with methods presented in the literature.
引用
收藏
页码:171 / 179
页数:9
相关论文
共 50 条
  • [21] Time/resource trade-off in the robust optimization of resource-constraint project scheduling problem under uncertainty
    Zhang, Zhe
    Zhong, Xuejuan
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (04) : 243 - 254
  • [22] A genetic algorithm approach for the time-cost trade-off in PERT networks
    Azaron, A
    Perkgoz, C
    Sakawa, M
    APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) : 1317 - 1339
  • [23] Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer
    Zou, Haobo
    Zhou, Guohua
    JOURNAL OF INTERNET TECHNOLOGY, 2021, 22 (01): : 197 - 207
  • [24] Cost -time trade-off efficient workflow scheduling in cloud
    Mboula, Jean Etienne Ndamlabin
    Kamla, Vivient Corneille
    Djamegni, Clementin Tayou
    SIMULATION MODELLING PRACTICE AND THEORY, 2020, 103
  • [25] Evaluating time-cost trade-off in a resource constraint GERT-type project scheduling problem considering rework
    Sadri, Shadi
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2024, 11 (01)
  • [26] Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    Vanhoucke, Mario
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 43 (05) : 1173 - 1202
  • [27] Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
    Xue Li
    Zhengwen He
    Nengmin Wang
    Mario Vanhoucke
    Journal of Combinatorial Optimization, 2022, 43 : 1173 - 1202
  • [28] Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
    Li, Hongbo
    Xu, Zhe
    Xiong, Li
    Liu, Yinbin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [29] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
  • [30] The Continuous Time-Resource Trade-off Scheduling Problem with Time Windows
    Artigues, Christian
    Hebrard, Emmanuel
    Quilliot, Alain
    Toussaint, Helene
    INFORMS JOURNAL ON COMPUTING, 2024, 36 (06) : 1676 - 1695