共 50 条
- [44] Application of NSGA-II and fuzzy TOPSIS to time–cost–quality trade-off resource leveling for scheduling an agricultural water supply project International Journal of Environmental Science and Technology, 2023, 20 : 10633 - 10660
- [47] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
- [50] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306