TIME-COST TRADE-OFF ANALYSIS IN SOME CONSTRAINED ASSIGNMENT PROBLEMS

被引:0
|
作者
GEETHA, S
VARTAK, MN
机构
关键词
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:97 / 101
页数:5
相关论文
共 50 条
  • [1] Time-cost trade-off analysis of a priority based assignment problem
    Kaur, Prabhjot
    Dahiya, Kalpana
    Verma, Vanita
    OPSEARCH, 2021, 58 (02) : 448 - 482
  • [2] Time-cost trade-off analysis of a priority based assignment problem
    Prabhjot Kaur
    Kalpana Dahiya
    Vanita Verma
    OPSEARCH, 2021, 58 : 448 - 482
  • [3] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [4] Time-cost trade-off in a multi-choice assignment problem
    Singh, Shalabh
    Singh, Sonia
    ENGINEERING OPTIMIZATION, 2022, 54 (04) : 576 - 592
  • [5] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [6] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [7] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [8] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +
  • [9] Using machine learning and GA to solve time-cost trade-off problems
    Li, Heng
    Cao, J.-N.
    Love, P.E.D.
    Journal of Construction Engineering and Management, 125 (05): : 347 - 353
  • [10] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189