共 50 条
- [42] Construction time-cost trade-off analysis using ant colony optimization algorithm PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
- [43] A fuzzy time-cost trade-off problem with credibility theory concepts PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
- [44] Project time-cost trade-off scheduling: a hybrid optimization approach INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
- [45] Time-Cost Trade-Off Optimization with a New Initial Population Approach TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
- [46] CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2015, 59 (03): : 361 - 371
- [49] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126