AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY

被引:9
|
作者
Lin, Chien-Liang [1 ]
Lai, Yu-Che [1 ]
机构
[1] Natl Kaohsiung Univ Sci & Technol, Dept Construct Engn, Kaohsiung, Taiwan
关键词
labor productivity; time-cost trade-off; optimization; genetic algorithm; CONSTRUCTION; OPTIMIZATION; DESIGN; ACCELERATION;
D O I
10.3846/jcem.2020.11663
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Optimization of the time-cost trade off (TCT) has received considerable attention for several decades. However, few studies have considered improving performance/productivity of existing crews. To shorten the gap to real-world applications, this study presents an improved TCT model that considers variable productivity using genetic algorithms (GAs). Through an illustrative case and a real world case, the results demonstrate that improving labor productivity of selected activities by allocating existing crews and management can yield an optimized solution. As such, a decision maker can implement a better optimized technique to reduce a project duration under budget while reducing the risk of liquidated damages. The main contribution of this study is to apply managerial improvement of labor productivity to TCT optimization, the project duration can be reduced owing to improved productivity of existing crews rather than inefficient overmanning, overlapping or costly substitution. In the end, three important managerial insights are presented and future research is recommended.
引用
收藏
页码:113 / 130
页数:18
相关论文
共 50 条
  • [1] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [2] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [3] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [4] A New Idea to LP Model for Time-cost Trade-off in Networks
    ZHAO Guohao
    JING Shentu and ZHANG Yaguang(Scanxi Institute of Economic Management
    Journal of Systems Science and Systems Engineering, 1995, (03) : 250 - 255
  • [5] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [6] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [7] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 475 - 486
  • [8] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [9] A GA-based fuzzy optimal model for time-cost trade-off in a project with resources consideration
    Parveen, Sultana
    Saha, Surajit Kumar
    International Journal of Industrial and Systems Engineering, 2013, 15 (02) : 153 - 170
  • [10] Time-cost trade-off via optimal control theory in Markov PERT networks
    Amir Azaron
    Hideki Katagiri
    Masatoshi Sakawa
    Annals of Operations Research, 2007, 150 : 47 - 64