A GA-based fuzzy optimal model for time-cost trade-off in a project with resources consideration

被引:0
|
作者
Parveen, Sultana [1 ]
Saha, Surajit Kumar [2 ]
机构
[1] Department of Industrial and Production Engineering, Bangladesh University of Engineering and Technology, Dhaka-1000, Bangladesh
[2] Titas Gas Transmission and Distribution Company Ltd., 105, Kazi Nazrul Islam Avenue, Dhaka-1215, Bangladesh
关键词
Genetic algorithms;
D O I
10.1504/IJISE.2013.056094
中图分类号
学科分类号
摘要
引用
收藏
页码:153 / 170
相关论文
共 50 条
  • [1] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [2] Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Ni, Yaodong
    APPLIED MATHEMATICS AND COMPUTATION, 2009, 215 (01) : 308 - 313
  • [3] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85
  • [4] Time-cost trade-off analysis of project networks in fuzzy environments
    Chen, Shih-Pin
    Tsai, Ming-Jiun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) : 386 - 397
  • [5] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [6] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [7] AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY
    Lin, Chien-Liang
    Lai, Yu-Che
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (02) : 113 - 130
  • [8] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach
    Glisovic, Natasa
    ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126
  • [9] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [10] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326