Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach

被引:0
|
作者
Bohra P. [1 ]
Verma R.S. [1 ]
机构
[1] Department of Science, Shyam University, Rajasthan, Lalsot, Dausa
关键词
LNSGA-III; Pareto-optimal set; Sustainable construction projects; TCET;
D O I
10.1007/s42107-024-01052-6
中图分类号
学科分类号
摘要
Within the construction project management, environmental concerns often outweigh time and cost considerations. However, with increasing awareness of the air pollution stemming from construction activities, there arises a critical necessity to balance time, cost, and environmental impact (measured in Equivalent-KgCO2). Traditional algorithms have struggled to effectively handle the multitude of non-dominated solutions, leading to a scarcity of better-quality Pareto-optimal solutions. To overcome this challenge, this paper recommends a novel methodology employing the Non-dominated Sorting Genetic Algorithm III (NSGA-III) to construct a model for optimizing the trade-off between time, cost, and environmental impact in construction projects. Latin Hypercube Sampling (LHS) is incorporated into NSGA III for population initialization, resulting in the development of LNSGA III. The developed LNSGA III model aims to efficiently navigate the intricate trade-offs inherent in construction projects. The efficiency of the proposed method is demonstrated by solving a case study project, which generates an exhaustive set of Pareto-optimal solutions. A comparison with existing algorithms demonstrates the superiority of LNSGA III. These solutions provide decision-makers with the flexibility to select the most suitable and sustainable options for activities execution based on their expertise and project-specific considerations. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:4343 / 4354
页数:11
相关论文
共 50 条
  • [11] Automated trade-off between time and cost in planning repetitive construction projects
    Hyari, Khalied Hesham
    El-Rayes, Khaled
    El-Mashaleh, Mohammad
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (08) : 749 - 761
  • [12] Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology
    Ankit Shrivastava
    Mukesh Pandey
    Asian Journal of Civil Engineering, 2024, 25 (8) : 5669 - 5684
  • [13] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [14] Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach
    Amir Prasad Behera
    Amit Dhawan
    V. Rathinakumar
    Manish Bharadwaj
    Jay Singh Rajput
    Krushna Chandra Sethi
    Asian Journal of Civil Engineering, 2025, 26 (2) : 761 - 776
  • [15] A novel oppositional teaching learning strategy based on the golden ratio to solve the Time-Cost-Environmental impact Trade-Off optimization problems
    Eirgash, Mohammad Azim
    Togan, Vedat
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 224
  • [16] Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming
    Elkalla I.
    Elbeltagi E.
    El Shikh M.
    Journal of The Institution of Engineers (India): Series A, 2021, 102 (1) : 267 - 278
  • [17] Development of time–cost trade-off optimization model for construction projects with MOPSO technique
    Agarwal A.K.
    Chauhan S.S.
    Sharma K.
    Sethi K.C.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4529 - 4539
  • [18] Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects
    Sethi K.C.
    Rathinakumar V.
    Harishankar S.
    Bhadoriya G.
    Pati A.K.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4633 - 4644
  • [19] A Multi-Objective Trade-Off Model in Sustainable Construction Projects
    Wu, Guangdong
    SUSTAINABILITY, 2017, 9 (11)
  • [20] A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects
    Monghasemi, Shahryar
    Nikoo, Mohammad Reza
    Fasaee, Mohammad Ali Khaksar
    Adamowski, Jan
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3089 - 3104