Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology

被引:0
|
作者
Ankit Shrivastava [1 ]
Mukesh Pandey [1 ]
机构
[1] ITM University,
关键词
Resource-constrained optimization; Quality management; Client satisfaction; NSGA-III; Civil construction projects;
D O I
10.1007/s42107-024-01137-2
中图分类号
学科分类号
摘要
引用
收藏
页码:5669 / 5684
页数:15
相关论文
共 50 条
  • [1] Integrating quality in resource-constrained time-cost trade-off optimization for civil construction projects using NSGA-III technique
    Shrivastava A.
    Pandey M.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4619 - 4632
  • [2] Construction time–cost–resources–quality trade-off optimization using NSGA-III
    Trivedi M.K.
    Sharma K.
    Asian Journal of Civil Engineering, 2023, 24 (8) : 3543 - 3555
  • [3] Development of resource-constrained time-cost trade-off optimization model for ventilation system retrofitting using NSGA-III
    Apurva Sharma
    Anupama Sharma
    Asian Journal of Civil Engineering, 2024, 25 (8) : 5685 - 5696
  • [4] Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects
    Sethi K.C.
    Rathinakumar V.
    Harishankar S.
    Bhadoriya G.
    Pati A.K.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4633 - 4644
  • [5] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [6] Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time-cost-quality-safety trade-off in construction projects
    Sharma, Kamal
    Trivedi, Manoj Kumar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (16) : 3158 - 3168
  • [7] Integrating environmental sustainability in construction Time-Cost trade-off for decision-making using hybrid NSGA-III and MOPSO approach
    Analene Montesines Nagayo
    Rekha Singh
    Amit Dhawan
    T. C. Manjunath
    Altayeb Qasem
    Krushna Chandra Sethi
    Kamal Sharma
    Asian Journal of Civil Engineering, 2025, 26 (4) : 1527 - 1542
  • [8] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [9] Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development
    Amir Prasad Behera
    Mayank Chauhan
    Gaurav Shrivastava
    Prachi Singh
    Jyoti Shukla
    Krushna Chandra Sethi
    Asian Journal of Civil Engineering, 2025, 26 (1) : 73 - 87
  • [10] NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects
    Abhishek Arya
    G. I. Gunarani
    V. Rathinakumar
    Apurva Sharma
    Aditya Kumar Pati
    Krushna Chandra Sethi
    Asian Journal of Civil Engineering, 2024, 25 (7) : 5613 - 5625