- [1] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
- [3] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects KSCE Journal of Civil Engineering, 2019, 23 : 3265 - 3274
- [4] Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer JOURNAL OF INTERNET TECHNOLOGY, 2021, 22 (01): : 197 - 207
- [7] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
- [8] LP/IP hybrid method for construction time-cost trade-off analysis Constr Manage Econ, 3 (265-276):