Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects

被引:21
|
作者
Albayrak, Gulcag [1 ]
机构
[1] Eskisehir Osmangazi Univ, Dept Civil Engn, TR-26040 Eskisehir, Turkey
关键词
Hybrid algorithm; Metaheuristic method; Optimization; Project planning; MULTIOBJECTIVE APPROACH; GENETIC ALGORITHM; OPTIMIZATION; COLONY; MODELS;
D O I
10.1007/s40996-020-00437-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Time and cost are two of the most important issues for construction planning. Nowadays, the relationship between time and cost becomes more crucial due to the competitive conditions. The contradiction of these two project factors which are affected by the various project constraints needs to be balanced. In this study, time-cost trade-off (TCT) problem is considered as a multi-objective problem. To solve TCT, a novel hybrid algorithm (NHA) is suggested. This method, which is developed by hybridization of particle swarm optimization (PSO) and genetic algorithm, is compared on the application with standard PSO. NHA, which is expected to be more efficient in terms of avoiding local best points and searching the solution space, also presents shorter and more economical alternatives of the project.
引用
收藏
页码:1295 / 1307
页数:13
相关论文
共 50 条
  • [21] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [22] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [23] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [24] TIME-COST TRADE-OFF ANALYSIS IN SOME CONSTRAINED ASSIGNMENT PROBLEMS
    GEETHA, S
    VARTAK, MN
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (01) : 97 - 101
  • [25] CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off
    Kaveh, Ali
    Khanzadi, Mostafa
    Alipour, Majid
    Naraky, Mohammad Rajabi
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2015, 59 (03): : 361 - 371
  • [26] An evolutionary stochastic discrete time-cost trade-off method
    Hussein, Bahaa
    Moselhi, Osama
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (07) : 581 - 600
  • [27] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [28] Two-Phase Differential Evolution for the Multiobjective Optimization of Time-Cost Tradeoffs in Resource-Constrained Construction Projects
    Cheng, Min-Yuan
    Duc-Hoc Tran
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2014, 61 (03) : 450 - 461
  • [29] A hybrid genetic algorithm for the discrete time-cost trade-off problem
    Sonmez, Rifat
    Bettemir, Onder Halis
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (13) : 11428 - 11434
  • [30] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311