共 50 条
- [1] The LP/IP hybrid method for construction time-cost trade-off analysis Constr. Manage. Econ., 3 (265-276):
- [2] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
- [7] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
- [10] Construction time-cost trade-off analysis using ant colony optimization algorithm PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044