共 50 条
- [32] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
- [33] LP/IP hybrid method for construction time-cost trade-off analysis Constr Manage Econ, 3 (265-276):
- [35] The LP/IP hybrid method for construction time-cost trade-off analysis Constr. Manage. Econ., 3 (265-276):
- [37] Using genetic algorithms to solve construction time-cost trade-off problems J Comput Civ Eng, 3 (184-189):