Time-cost trade-off optimization model for retrofitting planning projects using MOGA

被引:0
|
作者
Patil A.S. [1 ]
Agarwal A.K. [3 ]
Sharma K. [3 ]
Trivedi M.K. [3 ]
机构
[1] Planning, Madhav Institute of Technology and Science, Gwalior
[2] Department of Civil Engineering, Madhav Institute of Technology and Science, Gwalior
关键词
Multi-objective genetic algorithms (MOGAs); Optimization; Retrofitting; Sustainable urban development; Time-cost trade-off;
D O I
10.1007/s42107-024-01014-y
中图分类号
学科分类号
摘要
This paper introduces a novel Time-Cost Trade-Off Optimization Model (TCTOM) tailored for retrofitting projects in densely populated areas like India. Integrating structural, electrical, plumbing, HVAC, fire protection, insulation, and finishing aspects, the TCTOM utilizes Multi-Objective Genetic Algorithms (MOGAs) to identify Pareto-optimal solutions, balancing project duration and cost while meeting functional requirements and budget constraints. Through a case study in Gwalior, India, the TCTOM demonstrates practical applicability, offering decision support for stakeholders. Additionally, a comparison with existing methods such as MOPSO, MOACO, and MOTLBO highlights the superior performance of the proposed MOGA algorithm in terms of convergence and diversity of optimal solutions. The MOGA strikes an effective balance between convergence and diversity, producing a diverse set of high-quality solutions along the Pareto-optimal front within a reasonable computational time. Overall, the TCTOM, coupled with MOGA, provides a valuable tool for optimizing retrofitting projects, advancing sustainability and resilience in urban development initiatives. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:3823 / 3833
页数:10
相关论文
共 50 条
  • [1] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
  • [2] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [3] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [4] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [5] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [6] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [7] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [8] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [9] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [10] Development of resource-constrained time-cost trade-off optimization model for ventilation system retrofitting using NSGA-III
    Apurva Sharma
    Anupama Sharma
    Asian Journal of Civil Engineering, 2024, 25 (8) : 5685 - 5696