Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology

被引:0
|
作者
Ankit Shrivastava [1 ]
Mukesh Pandey [1 ]
机构
[1] ITM University,
关键词
Resource-constrained optimization; Quality management; Client satisfaction; NSGA-III; Civil construction projects;
D O I
10.1007/s42107-024-01137-2
中图分类号
学科分类号
摘要
引用
收藏
页码:5669 / 5684
页数:15
相关论文
共 50 条
  • [41] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [42] A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects
    Monghasemi, Shahryar
    Nikoo, Mohammad Reza
    Fasaee, Mohammad Ali Khaksar
    Adamowski, Jan
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3089 - 3104
  • [43] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [44] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO
    Arlbayrak, Gulcag
    Ozdemir, Ilker
    REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
  • [45] Optimizing ventilation system retrofitting: balancing time, cost, and indoor air quality with NSGA-III
    Apurva Sharma
    Anupama Sharma
    Asian Journal of Civil Engineering, 2024, 25 (8) : 5753 - 5764
  • [46] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
  • [47] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [48] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [49] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [50] CONSTRUCTION MATERIALS-BASED METHODOLOGY FOR TIME-COST-QUALITY TRADE-OFF PROBLEMS
    Kazaz, Aynur
    Ulubeyli, Serdar
    Bayram, E. R.
    Acikara, Turgut
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 35 - 41