Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology

被引:0
|
作者
Ankit Shrivastava [1 ]
Mukesh Pandey [1 ]
机构
[1] ITM University,
关键词
Resource-constrained optimization; Quality management; Client satisfaction; NSGA-III; Civil construction projects;
D O I
10.1007/s42107-024-01137-2
中图分类号
学科分类号
摘要
引用
收藏
页码:5669 / 5684
页数:15
相关论文
共 50 条
  • [21] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Heravi, Gholamreza
    Moridi, Saeed
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (08) : 3265 - 3274
  • [22] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Gholamreza Heravi
    Saeed Moridi
    KSCE Journal of Civil Engineering, 2019, 23 : 3265 - 3274
  • [23] CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off
    Kaveh, Ali
    Khanzadi, Mostafa
    Alipour, Majid
    Naraky, Mohammad Rajabi
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2015, 59 (03): : 361 - 371
  • [24] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [25] Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem
    Sonmez, Rifat
    Iranagh, Mahdi Abbasi
    Uysal, Furkan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
  • [26] Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach
    Bohra P.
    Verma R.S.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 4343 - 4354
  • [27] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [28] A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
    Zareei, Mostafa
    Hassan-Pour, Hossein Ali
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2015, 8 (04) : 653 - 685
  • [29] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [30] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111