Time-cost trade-off of construction project based on ant colony algorithm

被引:0
|
作者
Xiong, Ying
Kuang, Ya-Ping
机构
[1] School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China
[2] College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The time-cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a multi-objective optimization problem. A new evolutionary algorithm-ant colony optimization (ACO) algorithm was employed to solve the time-cost trade-off problem (TCTP). Combining with the modified adaptive weight approach (MAWA), the ACO algorithm can find out the optimal solution, and define the Pareto front as well. To verify the efficiency and performance of the proposed method, a test example was conducted and the results were compared with that of the exhaustive enumeration and the genetic algorithm. The results indicate that the ACO algorithm is much suitable for solving time-cost trade-off problem.
引用
收藏
页码:105 / 111
相关论文
共 50 条
  • [1] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [2] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [3] Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off
    Xiong, Ying
    Kuang, Yaping
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (02) : 153 - 156
  • [4] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [5] Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization
    Afshar, A.
    Ziaraty, A. Kasaeian
    Kaveh, A.
    Sharifi, F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) : 668 - 674
  • [6] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [7] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [8] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [9] THE TIME-COST TRADE-OFF ANALYSIS IN CONSTRUCTION PROJECT USING COMPUTER SIMULATION AND INTERACTIVE PROCEDURE
    Blaszczyk, Tomasz
    Nowak, Maciej
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2009, 15 (04) : 523 - 539
  • [10] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +