Time-cost trade-off of construction project based on ant colony algorithm

被引:0
|
作者
Xiong, Ying
Kuang, Ya-Ping
机构
[1] School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China
[2] College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The time-cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a multi-objective optimization problem. A new evolutionary algorithm-ant colony optimization (ACO) algorithm was employed to solve the time-cost trade-off problem (TCTP). Combining with the modified adaptive weight approach (MAWA), the ACO algorithm can find out the optimal solution, and define the Pareto front as well. To verify the efficiency and performance of the proposed method, a test example was conducted and the results were compared with that of the exhaustive enumeration and the genetic algorithm. The results indicate that the ACO algorithm is much suitable for solving time-cost trade-off problem.
引用
收藏
页码:105 / 111
相关论文
共 50 条
  • [21] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction
    Xie, Haiyan
    Sumam, Rugma Jayachandrakumar
    Carey, Nicholas
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
  • [22] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [24] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [25] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [26] The LP/IP hybrid method for construction time-cost trade-off analysis
    Department of General Engineering, Univ. Illinois at Urbana-Champaign, 104 S. Mathews Ave, Urbana, IL 61801, United States
    不详
    Constr. Manage. Econ., 3 (265-276):
  • [27] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
  • [28] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
  • [29] Using genetic algorithms to solve construction time-cost trade-off problems
    Univ of Illinois at Urbana-Champaign, Urbana, United States
    J Comput Civ Eng, 3 (184-189):
  • [30] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20