共 50 条
- [21] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
- [22] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
- [23] LP/IP hybrid method for construction time-cost trade-off analysis Constr Manage Econ, 3 (265-276):
- [26] The LP/IP hybrid method for construction time-cost trade-off analysis Constr. Manage. Econ., 3 (265-276):
- [27] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
- [28] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
- [29] Using genetic algorithms to solve construction time-cost trade-off problems J Comput Civ Eng, 3 (184-189):
- [30] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20