Time-cost trade-off of construction project based on ant colony algorithm

被引:0
|
作者
Xiong, Ying
Kuang, Ya-Ping
机构
[1] School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China
[2] College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The time-cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a multi-objective optimization problem. A new evolutionary algorithm-ant colony optimization (ACO) algorithm was employed to solve the time-cost trade-off problem (TCTP). Combining with the modified adaptive weight approach (MAWA), the ACO algorithm can find out the optimal solution, and define the Pareto front as well. To verify the efficiency and performance of the proposed method, a test example was conducted and the results were compared with that of the exhaustive enumeration and the genetic algorithm. The results indicate that the ACO algorithm is much suitable for solving time-cost trade-off problem.
引用
收藏
页码:105 / 111
相关论文
共 50 条
  • [31] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [32] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [33] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [34] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [35] Network analysis algorithm for the solution of discrete time-cost trade-off problem
    Önder Halis Bettemir
    M. Talat Birgönül
    KSCE Journal of Civil Engineering, 2017, 21 : 1047 - 1058
  • [36] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [37] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 475 - 486
  • [38] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [39] Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Ni, Yaodong
    APPLIED MATHEMATICS AND COMPUTATION, 2009, 215 (01) : 308 - 313
  • [40] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058