Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty

被引:0
|
作者
Ouyang Yong-liu [1 ]
Zhang Meng-xiang [1 ]
Han Lu [1 ]
Lu Yi [1 ]
机构
[1] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
construction project; fuzzy uncertainty; genetic algorithm; multiproject time -cost trade-off scheduling problem; MULTICRITERIA DECISION-MAKING; GENETIC ALGORITHM; OPTIMIZATION;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper presents a multiproject time-cost trade-off scheduling problem (mPTCTSP) for large-scale construction systems with multiple modes under fuzzy environment. A multiobjective decision making model is established in the total project duration which is regarded as a fuzzy variable. The fuzzy numbers in the model are defuzzified by using an expected value operator with an optimistic-pessimistic index. The multiobjective fuzzy optimization model designed in this study aims to simultaneously minimize project duration and delaying punishment cost. Furthermore, the hybrid genetic algorithm with fuzzy logic controller (flc-hGA) is developed to find feasible solutions. Finally, the Jinping-II Hydroelectric Project is used as a practical example to demonstrate the practicality and efficiency of the model.
引用
收藏
页码:282 / 292
页数:11
相关论文
共 50 条
  • [41] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306
  • [43] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [44] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [45] An integrated multi-objective optimization model for solving the construction time-cost trade-off problem
    Koo, Choongwan
    Hong, Taehoon
    Kim, Sangbum
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (03) : 323 - 333
  • [46] Research on the fully fuzzy time-cost trade-off based on genetic algorithms
    Jin Chao-guang
    Jl Zhuo-shang
    Lin Yan
    Zhao Yuan-min
    Huang Zhen-dong
    JOURNAL OF MARINE SCIENCE AND APPLICATION, 2005, 4 (03) : 18 - 23
  • [47] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction
    Xie, Haiyan
    Sumam, Rugma Jayachandrakumar
    Carey, Nicholas
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
  • [49] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [50] The LP/IP hybrid method for construction time-cost trade-off analysis
    Department of General Engineering, Univ. Illinois at Urbana-Champaign, 104 S. Mathews Ave, Urbana, IL 61801, United States
    不详
    Constr. Manage. Econ., 3 (265-276):