Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty

被引:0
|
作者
Ouyang Yong-liu [1 ]
Zhang Meng-xiang [1 ]
Han Lu [1 ]
Lu Yi [1 ]
机构
[1] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
construction project; fuzzy uncertainty; genetic algorithm; multiproject time -cost trade-off scheduling problem; MULTICRITERIA DECISION-MAKING; GENETIC ALGORITHM; OPTIMIZATION;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper presents a multiproject time-cost trade-off scheduling problem (mPTCTSP) for large-scale construction systems with multiple modes under fuzzy environment. A multiobjective decision making model is established in the total project duration which is regarded as a fuzzy variable. The fuzzy numbers in the model are defuzzified by using an expected value operator with an optimistic-pessimistic index. The multiobjective fuzzy optimization model designed in this study aims to simultaneously minimize project duration and delaying punishment cost. Furthermore, the hybrid genetic algorithm with fuzzy logic controller (flc-hGA) is developed to find feasible solutions. Finally, the Jinping-II Hydroelectric Project is used as a practical example to demonstrate the practicality and efficiency of the model.
引用
收藏
页码:282 / 292
页数:11
相关论文
共 50 条
  • [21] A new approach to solve time-cost trade-off problem with fuzzy decision variables
    Ghazanfari, M.
    Yousefli, A.
    Ameli, M. S. Jabal
    Bozorgi-Amiri, A.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 408 - 414
  • [22] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [23] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [24] Solving large-scale discrete time-cost trade-off problem using hybrid multi-verse optimizer model
    Son, Pham Vu Hong
    Dang, Nghiep Trinh Nguyen
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [25] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [26] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [27] Discrete Time-Cost-Environment Trade-Off Problem and Its Application to a Large-Scale Construction Project
    Zheng, Huan
    Zhong, Lin
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 1375 - 1382
  • [28] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [29] A NEW ANALYTICAL METHODOLOGY TO HANDLE TIME-COST TRADE-OFF PROBLEM WITH CONSIDERING QUALITY LOSS COST UNDER INTERVAL-VALUED FUZZY UNCERTAINTY
    Haghighi, Mohammad Hossein
    Mousavi, Seyed Meysam
    Antucheviciene, Jurgita
    Mohagheghi, Vahid
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2019, 25 (02) : 277 - 299
  • [30] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822