A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS

被引:21
|
作者
Zhang, Lihui [1 ]
Zou, Xin [1 ]
Qi, Jianxun [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
关键词
Soft logic; repetitive construction projects; time/cost trade-off; scheduling; LINEAR PROJECTS; MODEL; OPTIMIZATION; ALGORITHM; PATH;
D O I
10.3934/jimo.2015.11.1423
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The discrete time/cost trade-off problem (DTCTP) is commonly encountered in repetitive project scheduling. The current models for this problem assume that logical sequences of activities cannot be changed in different units. However, logical sequences are often changed to shorten the project time and minimize project total cost in many practical situations. This characteristic of repetitive activities is referred to as the soft logic. This paper presents a mixed integer nonlinear programming model that combines the general DTCTP and the concept of soft logic. The execution modes of an activity in different units are also considered. The DTCTP is known to be strongly NP-hard, and the introduction of soft logic makes it even more complex. A genetic algorithm (GA) is proposed to resolve the problem. The effectiveness of the proposed GA is verified using the example of a bridge construction project presented in the previous literature. The model proposed in this paper provides more flexibility to reduce the total cost and time of a repetitive project for the planners.
引用
收藏
页码:1423 / 1434
页数:12
相关论文
共 50 条
  • [21] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
  • [22] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [23] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects
    Bragadin, Marco Alvise
    Pozzi, Luca
    Kahkonen, Kalle
    SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
  • [24] Adaptive opposition slime mold algorithm for time–cost–quality–safety trade-off for construction projects
    Son P.V.H.
    Khoi L.N.Q.
    Asian Journal of Civil Engineering, 2023, 24 (7) : 1927 - 1942
  • [25] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [26] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [27] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [28] Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money
    Kebriyaii, Omid
    Heidari, Ali
    Khalilzadeh, Mohammad
    Antucheviciene, Jurgita
    Pavlovskis, Miroslavas
    SYMMETRY-BASEL, 2021, 13 (12):
  • [29] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [30] Scheduling parallel CNC machines with time/cost trade-off considerations
    Gurel, Sinan
    Akturk, M. Selim
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (09) : 2774 - 2789