Quantifying the Impact of I/D Contracting on the Time/Cost Trade-Off for Pavement Rehabilitation Projects

被引:0
|
作者
Ibrahim, Mohamed [1 ]
Orabi, Wallied [2 ]
机构
[1] Florida Int Univ, Dept Civil & Environm Engn, Miami, FL 33174 USA
[2] Florida Int Univ, OHL Sch Construct, Miami, FL 33174 USA
关键词
HIGHWAY CONSTRUCTION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The current deteriorating state of the highway system in the Unites States is shifting the balance of highway construction projects towards maintenance and rehabilitation works on the expense of new construction. Hence, state highway agencies (SHAs) are now challenged to complete a substantial scope of highway rehabilitation work while controlling and reducing the negative impacts on the travelling public. Therefore, alternative contracting methods that are aimed at reducing highway projects' durations, such as the incentive/disincentive (I/D) method, are gaining popularity among SHAs. For instance, the value of the ID assigned in a highway project has a significant effect on expediting the completion of the project while saving tax dollars. However, the current practice of estimating and assigning the ID value is not adequate and is frequently either overestimated or underestimated. This paper presents the development of a new model to accurately estimate ID value in highway rehabilitation projects based on the desired level of duration reduction. The model quantifies the impact of the I/D contracting method on the trade-off between time and cost of highway rehabilitation projects which should prove useful to SHAs in determining and assigning values of ID that are proper for the required project duration reduction together with the likelihood of achieving it.
引用
收藏
页码:679 / 688
页数:10
相关论文
共 50 条
  • [21] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [22] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [23] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [24] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [25] GA Optimization Model for Time/cost Trade-off Problem in Repetitive Projects Considering Resource Continuity
    Zhang, Li-hui
    Zou, Xin
    Su, Zhi-xiong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 611 - 617
  • [26] Hybrid time-quality-cost trade-off problems
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2018, 5 : 306 - 318
  • [27] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [28] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 475 - 486
  • [29] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [30] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126