Quantifying the Impact of I/D Contracting on the Time/Cost Trade-Off for Pavement Rehabilitation Projects

被引:0
|
作者
Ibrahim, Mohamed [1 ]
Orabi, Wallied [2 ]
机构
[1] Florida Int Univ, Dept Civil & Environm Engn, Miami, FL 33174 USA
[2] Florida Int Univ, OHL Sch Construct, Miami, FL 33174 USA
关键词
HIGHWAY CONSTRUCTION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The current deteriorating state of the highway system in the Unites States is shifting the balance of highway construction projects towards maintenance and rehabilitation works on the expense of new construction. Hence, state highway agencies (SHAs) are now challenged to complete a substantial scope of highway rehabilitation work while controlling and reducing the negative impacts on the travelling public. Therefore, alternative contracting methods that are aimed at reducing highway projects' durations, such as the incentive/disincentive (I/D) method, are gaining popularity among SHAs. For instance, the value of the ID assigned in a highway project has a significant effect on expediting the completion of the project while saving tax dollars. However, the current practice of estimating and assigning the ID value is not adequate and is frequently either overestimated or underestimated. This paper presents the development of a new model to accurately estimate ID value in highway rehabilitation projects based on the desired level of duration reduction. The model quantifies the impact of the I/D contracting method on the trade-off between time and cost of highway rehabilitation projects which should prove useful to SHAs in determining and assigning values of ID that are proper for the required project duration reduction together with the likelihood of achieving it.
引用
收藏
页码:679 / 688
页数:10
相关论文
共 50 条
  • [31] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [32] Cost -time trade-off efficient workflow scheduling in cloud
    Mboula, Jean Etienne Ndamlabin
    Kamla, Vivient Corneille
    Djamegni, Clementin Tayou
    SIMULATION MODELLING PRACTICE AND THEORY, 2020, 103
  • [33] Time trade-off with someone to live for: impact of having significant others on time trade-off valuations of hypothetical health states
    Hansen, Tonya Moen
    Stavem, Knut
    Rand, Kim
    QUALITY OF LIFE RESEARCH, 2022, 31 (04) : 1199 - 1207
  • [34] Time trade-off with someone to live for: impact of having significant others on time trade-off valuations of hypothetical health states
    Tonya Moen Hansen
    Knut Stavem
    Kim Rand
    Quality of Life Research, 2022, 31 : 1199 - 1207
  • [35] Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy
    Zou, Haobo
    Zhou, Guohua
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (12) : 1271 - 1281
  • [36] Optimizing of Discrete Time- cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
    Albayrak, Gulcag
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2023, 67 (03): : 806 - 818
  • [37] Application of time-cost trade-off model in forest management projects: The case of Oak decline project
    Zandebasiri, Mehdi
    Vacik, Harald
    Etongo, Daniel
    Dorfstetter, Yasmin
    Soosani, Javad
    Pourhashemi, Mehdi
    JOURNAL OF FOREST SCIENCE, 2019, 65 (12) : 481 - 492
  • [38] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Vanhoucke, Mario
    Debels, Dieter
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 311 - 326
  • [39] Time, cost and quality trade-off in project management: A case study
    Asia Inst of Technology, Bangkok, Thailand
    Int J Proj Manage, 4 (249-256):
  • [40] Time-cost-quality trade-off analysis for highway construction
    El-Rayes, K
    Kandil, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) : 477 - 486