Quantifying the Impact of I/D Contracting on the Time/Cost Trade-Off for Pavement Rehabilitation Projects

被引:0
|
作者
Ibrahim, Mohamed [1 ]
Orabi, Wallied [2 ]
机构
[1] Florida Int Univ, Dept Civil & Environm Engn, Miami, FL 33174 USA
[2] Florida Int Univ, OHL Sch Construct, Miami, FL 33174 USA
关键词
HIGHWAY CONSTRUCTION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The current deteriorating state of the highway system in the Unites States is shifting the balance of highway construction projects towards maintenance and rehabilitation works on the expense of new construction. Hence, state highway agencies (SHAs) are now challenged to complete a substantial scope of highway rehabilitation work while controlling and reducing the negative impacts on the travelling public. Therefore, alternative contracting methods that are aimed at reducing highway projects' durations, such as the incentive/disincentive (I/D) method, are gaining popularity among SHAs. For instance, the value of the ID assigned in a highway project has a significant effect on expediting the completion of the project while saving tax dollars. However, the current practice of estimating and assigning the ID value is not adequate and is frequently either overestimated or underestimated. This paper presents the development of a new model to accurately estimate ID value in highway rehabilitation projects based on the desired level of duration reduction. The model quantifies the impact of the I/D contracting method on the trade-off between time and cost of highway rehabilitation projects which should prove useful to SHAs in determining and assigning values of ID that are proper for the required project duration reduction together with the likelihood of achieving it.
引用
收藏
页码:679 / 688
页数:10
相关论文
共 50 条
  • [41] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - CLOSURE
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 375 - 376
  • [42] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [43] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [44] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Mario Vanhoucke
    Dieter Debels
    Journal of Scheduling, 2007, 10 : 311 - 326
  • [45] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - DISCUSSION
    HANSCOM, GB
    WAUGH, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 374 - 375
  • [46] A reduction tree approach for the Discrete Time/Cost Trade-Off Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2022, 143
  • [47] Scheduling parallel CNC machines with time/cost trade-off considerations
    Gurel, Sinan
    Akturk, M. Selim
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (09) : 2774 - 2789
  • [48] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [49] Robust optimization models for the discrete time/cost trade-off problem
    Hazir, Oncu
    Erel, Erdal
    Gunalay, Yavuz
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 130 (01) : 87 - 95
  • [50] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326