A contingency approach for time-cost trade-off in construction projects based on machine learning techniques

被引:3
|
作者
Wang, Peipei [1 ]
Wang, Kun [2 ]
Huang, Yunhan [1 ]
Fenn, Peter [2 ]
机构
[1] Jiangsu Ocean Univ, Sch Civil & Ocean Engn, Lianyungang, Peoples R China
[2] Univ Manchester, Sch Engn, Dept Engn Management, Manchester, England
关键词
Construction; Novel model; Project management; Risk management; CRITICAL SUCCESS FACTORS; PUBLIC-PRIVATE PARTNERSHIPS; DELAY FACTORS; OVERRUN; PERFORMANCE; MANAGEMENT; ERRORS; SOLVE; MODEL;
D O I
10.1108/ECAM-11-2022-1104
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeTime-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly focused on the technical calculation towards the optimal combination of activities to be accelerated, while the managerial aspects are mostly neglected. This paper aims to understand the managerial efforts necessary to prepare construction projects ready for an upcoming trade-off implementation.Design/methodology/approachA preliminary list of critical factors was first identified from the literature and verified by a Delphi survey. Quantitative data was then collected by a questionnaire survey to first shortlist the preliminary factors and quantify the predictive model with different machine learning algorithms, i.e. k-nearest neighbours (kNN), radial basis function (RBF), multiplayer perceptron (MLP), multinomial logistic regression (MLR), naive Bayes classifier (NBC) and Bayesian belief networks (BBNs).FindingsThe model's independent variable importance ranking revealed that the top challenges faced were the realism of contractual obligation, contractor planning and control and client management and monitoring. Among the tested machine learning algorithms, multilayer perceptron was demonstrated to be the most suitable in this case. This model accuracy reached 96.5% with the training dataset and 95.6% with an independent test dataset and could be used as the contingency approach for time-cost trade-offs.Originality/valueThe identified factor list contributed to the theoretical explanation of the failed implementation in general and practical managerial improvement to better avoid such failure. In addition, the established predictive model provided an ad-hoc early warning and diagnostic tool to better ensure time-cost implementation success.
引用
收藏
页码:4677 / 4695
页数:19
相关论文
共 50 条
  • [21] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [22] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [23] The LP/IP hybrid method for construction time-cost trade-off analysis
    Department of General Engineering, Univ. Illinois at Urbana-Champaign, 104 S. Mathews Ave, Urbana, IL 61801, United States
    不详
    Constr. Manage. Econ., 3 (265-276):
  • [24] Using genetic algorithms to solve construction time-cost trade-off problems
    Univ of Illinois at Urbana-Champaign, Urbana, United States
    J Comput Civ Eng, 3 (184-189):
  • [25] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [26] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [27] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [28] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [29] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 475 - 486
  • [30] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619