A contingency approach for time-cost trade-off in construction projects based on machine learning techniques

被引:3
|
作者
Wang, Peipei [1 ]
Wang, Kun [2 ]
Huang, Yunhan [1 ]
Fenn, Peter [2 ]
机构
[1] Jiangsu Ocean Univ, Sch Civil & Ocean Engn, Lianyungang, Peoples R China
[2] Univ Manchester, Sch Engn, Dept Engn Management, Manchester, England
关键词
Construction; Novel model; Project management; Risk management; CRITICAL SUCCESS FACTORS; PUBLIC-PRIVATE PARTNERSHIPS; DELAY FACTORS; OVERRUN; PERFORMANCE; MANAGEMENT; ERRORS; SOLVE; MODEL;
D O I
10.1108/ECAM-11-2022-1104
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeTime-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly focused on the technical calculation towards the optimal combination of activities to be accelerated, while the managerial aspects are mostly neglected. This paper aims to understand the managerial efforts necessary to prepare construction projects ready for an upcoming trade-off implementation.Design/methodology/approachA preliminary list of critical factors was first identified from the literature and verified by a Delphi survey. Quantitative data was then collected by a questionnaire survey to first shortlist the preliminary factors and quantify the predictive model with different machine learning algorithms, i.e. k-nearest neighbours (kNN), radial basis function (RBF), multiplayer perceptron (MLP), multinomial logistic regression (MLR), naive Bayes classifier (NBC) and Bayesian belief networks (BBNs).FindingsThe model's independent variable importance ranking revealed that the top challenges faced were the realism of contractual obligation, contractor planning and control and client management and monitoring. Among the tested machine learning algorithms, multilayer perceptron was demonstrated to be the most suitable in this case. This model accuracy reached 96.5% with the training dataset and 95.6% with an independent test dataset and could be used as the contingency approach for time-cost trade-offs.Originality/valueThe identified factor list contributed to the theoretical explanation of the failed implementation in general and practical managerial improvement to better avoid such failure. In addition, the established predictive model provided an ad-hoc early warning and diagnostic tool to better ensure time-cost implementation success.
引用
收藏
页码:4677 / 4695
页数:19
相关论文
共 50 条
  • [41] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - DISCUSSION
    HANSCOM, GB
    WAUGH, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 374 - 375
  • [43] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [44] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [45] Research on the fully fuzzy time-cost trade-off based on genetic algorithms
    Jin Chao-guang
    Jl Zhuo-shang
    Lin Yan
    Zhao Yuan-min
    Huang Zhen-dong
    JOURNAL OF MARINE SCIENCE AND APPLICATION, 2005, 4 (03) : 18 - 23
  • [46] Research on the fully fuzzy time-cost trade-off based on genetic algorithms
    Jin Chao-guang
    Ji Zhuo-shang
    Lin Yan
    Zhao Yuan-min
    Huang Zhen-dong
    Journal of Marine Science and Application, 2005, 4 (3) : 18 - 23
  • [47] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [48] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [49] An evolutionary stochastic discrete time-cost trade-off method
    Hussein, Bahaa
    Moselhi, Osama
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (07) : 581 - 600
  • [50] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231