共 50 条
- [24] Fuzzy-multi-mode Resource-constrained Discrete Time-cost- resource Optimization in Project Scheduling Using ENSCBO PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2022, 66 (01): : 50 - 62
- [30] An Assignment-Based Continuous-Time MILP Model for the Resource-Constrained Project Scheduling Problem 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 35 - 39