NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects

被引:0
|
作者
Abhishek Arya [1 ]
G. I. Gunarani [2 ]
V. Rathinakumar [2 ]
Apurva Sharma [3 ]
Aditya Kumar Pati [4 ]
Krushna Chandra Sethi [4 ]
机构
[1] Jodhpur Institute of Engineering and Technology,
[2] SASTRA Deemed to Be University,undefined
[3] Maulana Azad National Institute of Technology,undefined
[4] Centurion University of Technology and Management,undefined
关键词
Retrofitting; NSGA-III; Optimization; RCTCQ-TOOM; Quality constraints;
D O I
10.1007/s42107-024-01133-6
中图分类号
学科分类号
摘要
引用
收藏
页码:5613 / 5625
页数:12
相关论文
共 50 条
  • [31] Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (07) : 1979 - 2004
  • [32] Preemptive Multi-mode Resource-Constrained Discrete Time-Cost-Resource Optimization via Non-dominated Sorting Genetic Algorithm
    Ma, Wei-min
    Che, Yang-yang
    Ke, Hua
    PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 719 - 728
  • [33] A multi-objective optimization method based on NSGA-III for water quality sensor placement with the aim of reducing potential of important nodes contamination
    Jafari, Hamideh
    Nazif, Sara
    Rajaee, Taher
    WATER SUPPLY, 2022, 22 (01) : 928 - 944
  • [34] Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
    Ghoddousi, Parviz
    Eshtehardian, Ehsan
    Jooybanpour, Shirin
    Javanmardi, Ashtad
    AUTOMATION IN CONSTRUCTION, 2013, 30 : 216 - 227
  • [35] A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution
    Peng Wuliang
    Wang Chengen
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (06) : 600 - 609
  • [36] GA Optimization Model for Time/cost Trade-off Problem in Repetitive Projects Considering Resource Continuity
    Zhang, Li-hui
    Zou, Xin
    Su, Zhi-xiong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 611 - 617
  • [37] A comprehensive optimization model based on time and cost constraints for resource selection in data grid
    Ming-Cheng Q.
    Wu X.-H.
    Yang X.-Z.
    Journal of Software, 2011, 6 (12 SPEC. ISSUE) : 2472 - 2478
  • [38] Multi-objective optimization of variable altitude high-dimensional compression-ignition aviation piston engine based on Kriging model and NSGA-III
    Xu, Yuchen
    Sun, Min
    Chen, Guisheng
    Xiao, Renxin
    Gong, Hang
    Yang, Jie
    Yang, Sen
    ENERGY, 2025, 320
  • [39] A ROBUST TIME-COST-QUALITY-ENERGY-ENVIRONMENT TRADE-OFF WITH RESOURCE-CONSTRAINED IN PROJECT MANAGEMENT: A CASE STUDY FOR A BRIDGE CONSTRUCTION PROJECT
    Lotfi, Reza
    Yadegari, Zahra
    Hosseini, Seyed Hossein
    Khameneh, Amir Hossein
    Tirkolaee, Erfan Babaee
    Weber, Gerhard-Wilhelm
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 375 - 396
  • [40] Resource-constrained time–cost-quality-energy-environment tradeoff problem by considering blockchain technology, risk and robustness: a case study of healthcare project
    Reza Lotfi
    Bahareh Kargar
    Alireza Gharehbaghi
    Hanif Hazrati
    Sima Nazari
    Mohsen Amra
    Environmental Science and Pollution Research, 2022, 29 : 63560 - 63576