共 50 条
- [22] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
- [24] Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer JOURNAL OF INTERNET TECHNOLOGY, 2021, 22 (01): : 197 - 207
- [29] Multi-Mode Discrete Time-Cost-Environment Trade-Off Problem of Construction Systems for Large-Scale Hydroelectric Projects PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2015, 362 : 337 - 346