Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects

被引:0
|
作者
Sethi K.C. [1 ]
Rathinakumar V. [2 ]
Harishankar S. [2 ]
Bhadoriya G. [3 ]
Pati A.K. [4 ]
机构
[1] Civil Engineering Department, Centurion University of Technology and Management, Gajapati
[2] School of Civil Engineering, SASTRA Deemed to be University, Thanjavur
[3] Department of Civil Engineering, Madhav Institute of Technology and Science, Gwalior
[4] Department of Mathematics, School of Applied Sciences, Centurion University of Technology and Management, Gajapati
关键词
OBNSGA-III; Optimization; Pareto-optimal solutions; Time-cost-resources trade-off;
D O I
10.1007/s42107-024-01069-x
中图分类号
学科分类号
摘要
Balancing discrete time, cost, and resource allocation poses a significant challenge in construction projects due to their inherent conflicts. The competitive nature of the construction market underscores the importance of optimizing trade-offs among these objectives for successful project completion. To address the complexities and limitations of existing models, this paper presents a discrete time-cost-resources trade-off (DTCRT) optimization framework utilizing the opposition-based non-dominated sorting genetic algorithm (OBNSGA III), in which opposition-based learning (OBL) is used for generating the initial population. The proposed model accommodates multi-mode project activities with varying resource requirements. A case study application demonstrates the efficacy of proposed approach in generating the Pareto-optimal solutions. Comparative analysis against existing techniques validates the effectiveness of proposed method. Additionally, trade-off plots and an a priori decision-making tool are provided to facilitate selection among the generated solutions by project stakeholders. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:4633 / 4644
页数:11
相关论文
共 50 条
  • [11] Development of time–cost trade-off optimization model for construction projects with MOPSO technique
    Agarwal A.K.
    Chauhan S.S.
    Sharma K.
    Sethi K.C.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4529 - 4539
  • [12] Opposition-Based Multiple-Objective Differential Evolution to Solve the Time-Cost-Environment Impact Trade-Off Problem in Construction Projects
    Cheng, Min-Yuan
    Duc-Hoc Tran
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2015, 29 (05)
  • [13] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [14] NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects
    Abhishek Arya
    G. I. Gunarani
    V. Rathinakumar
    Apurva Sharma
    Aditya Kumar Pati
    Krushna Chandra Sethi
    Asian Journal of Civil Engineering, 2024, 25 (7) : 5613 - 5625
  • [15] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [16] Development of optimization model for balancing time, cost, and environmental impact in retrofitting projects with NSGA-III
    Sethi K.C.
    Prajapati U.
    Parihar A.
    Gupta C.
    Shrivastava G.
    Sharma K.
    Asian Journal of Civil Engineering, 2024, 25 (7) : 5123 - 5136
  • [17] Automated trade-off between time and cost in planning repetitive construction projects
    Hyari, Khalied Hesham
    El-Rayes, Khaled
    El-Mashaleh, Mohammad
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (08) : 749 - 761
  • [18] Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach
    Bohra P.
    Verma R.S.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 4343 - 4354
  • [19] Integrating environmental sustainability in construction Time-Cost trade-off for decision-making using hybrid NSGA-III and MOPSO approach
    Analene Montesines Nagayo
    Rekha Singh
    Amit Dhawan
    T. C. Manjunath
    Altayeb Qasem
    Krushna Chandra Sethi
    Kamal Sharma
    Asian Journal of Civil Engineering, 2025, 26 (4) : 1527 - 1542
  • [20] Adaptive opposition slime mold algorithm for time–cost–quality–safety trade-off for construction projects
    Son P.V.H.
    Khoi L.N.Q.
    Asian Journal of Civil Engineering, 2023, 24 (7) : 1927 - 1942