Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects

被引:0
|
作者
Sethi K.C. [1 ]
Rathinakumar V. [2 ]
Harishankar S. [2 ]
Bhadoriya G. [3 ]
Pati A.K. [4 ]
机构
[1] Civil Engineering Department, Centurion University of Technology and Management, Gajapati
[2] School of Civil Engineering, SASTRA Deemed to be University, Thanjavur
[3] Department of Civil Engineering, Madhav Institute of Technology and Science, Gwalior
[4] Department of Mathematics, School of Applied Sciences, Centurion University of Technology and Management, Gajapati
关键词
OBNSGA-III; Optimization; Pareto-optimal solutions; Time-cost-resources trade-off;
D O I
10.1007/s42107-024-01069-x
中图分类号
学科分类号
摘要
Balancing discrete time, cost, and resource allocation poses a significant challenge in construction projects due to their inherent conflicts. The competitive nature of the construction market underscores the importance of optimizing trade-offs among these objectives for successful project completion. To address the complexities and limitations of existing models, this paper presents a discrete time-cost-resources trade-off (DTCRT) optimization framework utilizing the opposition-based non-dominated sorting genetic algorithm (OBNSGA III), in which opposition-based learning (OBL) is used for generating the initial population. The proposed model accommodates multi-mode project activities with varying resource requirements. A case study application demonstrates the efficacy of proposed approach in generating the Pareto-optimal solutions. Comparative analysis against existing techniques validates the effectiveness of proposed method. Additionally, trade-off plots and an a priori decision-making tool are provided to facilitate selection among the generated solutions by project stakeholders. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:4633 / 4644
页数:11
相关论文
共 50 条
  • [41] A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project
    Zheng, Huan
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2018, : 1709 - 1721
  • [42] A mixed (continuous plus discrete) time-cost trade-off model considering four different relationships with lag time
    Son, Jaeho
    Hong, TaeHoon
    Lee, Sangyoub
    KSCE JOURNAL OF CIVIL ENGINEERING, 2013, 17 (02) : 281 - 291
  • [43] Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution
    Duc-Long Luong
    Duc-Hoc Tran
    Phong Thanh Nguyen
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (03) : 271 - 283
  • [44] Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Hatamleh, Muhammad T.
    Song, Siyuan
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [45] The discrete time, cost and quality trade-off problem in project scheduling: An efficient solution method based on cellde algorithm
    Assadipour, Gh.
    Iranmanesh, H.
    South African Journal of Industrial Engineering, 2010, 21 (01) : 93 - 101
  • [46] THE DISCRETE TIME, COST AND QUALITY TRADE-OFF PROBLEM IN PROJECT SCHEDULING: AN EFFICIENT SOLUTION METHOD BASED ON CELLDE ALGORITHM
    Assadipour, Gh
    Iranmanesh, H.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2010, 21 (01): : 93 - 101
  • [47] Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling
    Liu, Dian
    Li, Heng
    Wang, Hongwei
    Qi, Chao
    Rose, Timothy
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 148
  • [48] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [49] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO
    Arlbayrak, Gulcag
    Ozdemir, Ilker
    REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
  • [50] Time-Cost-Quality Trade-off Model for Optimal Pile Type Selection Using Discrete Particle Swarm Optimization Algorithm
    Lateef, Hanaa H.
    Burhan, Abbas M.
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (11): : 2461 - 2471