Linear programming based approaches for the discrete time/cost trade-off problem in project networks

被引:18
|
作者
Hafizoglu, A. B. [2 ]
Azizoglu, M. [1 ]
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Arizona State Univ, Tempe, AZ 85287 USA
关键词
project management; Time/Cost Trade-off; Linear Programming; Branch and Bound;
D O I
10.1057/jors.2009.20
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In project management, the activity durations can often be reduced by dedicating additional resources. The Time/Cost Trade-off Problem considers the compromise between the total cost and the project duration. The discrete version of the problem assumes a number of time/cost pairs, called modes, and selects a mode for each activity. In this paper, we consider the Discrete Time/Cost Trade-off Problem. We study the Deadline Problem, that is, the problem of minimizing total cost subject to a deadline on the project duration. To solve the Deadline Problem, we propose optimization and approximation algorithms that are based on the optimal Linear Programming Relaxation solutions. Our computational results from large-sized problem instances reveal the satisfactory behaviour of our algorithms. Journal of the Operational Research Society (2010) 61, 676-685. doi: 10.1057/jors.2009.20 Published online 25 March 2009
引用
收藏
页码:676 / 685
页数:10
相关论文
共 50 条
  • [1] Optimal procedures for the discrete time cost trade-off problem in project networks
    Demeulemeester, EL
    Herroelen, WS
    Elmaghraby, SE
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (01) : 50 - 68
  • [2] Optimal procedures for the discrete time/cost trade-off problem in project networks
    Katholieke Universiteit Leuven, Leuven, Belgium
    Eur J Oper Res, 1 (50-68):
  • [3] New computational results on the discrete time/cost trade-off problem in project networks
    Demeulemeester, E
    De Reyck, B
    Foubert, B
    Herroelen, W
    Vanhoucke, M
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (11) : 1153 - 1163
  • [4] On the discrete time, cost and quality trade-off problem
    Tareghian, Hamed R.
    Taheri, Seyyed Hassan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) : 1305 - 1312
  • [5] Local search methods for the discrete time/resource trade-off problem in project networks
    De Reyck, B
    Demeulemeester, E
    Herroelen, W
    NAVAL RESEARCH LOGISTICS, 1998, 45 (06) : 553 - 578
  • [6] A GOAL PROGRAMMING-MODEL FOR PROJECT CRASHING WITH PIECEWISE LINEAR TIME COST TRADE-OFF
    VRAT, P
    KRIENGKRAIRUT, C
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1986, 10 (02): : 161 - 172
  • [7] Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
    Li, Hongbo
    Xu, Zhe
    Xiong, Li
    Liu, Yinbin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [8] The discrete time/resource trade-off problem in project networks: a branch-and-bound approach
    Demeulemeester, E
    De Reyck, B
    Herroelen, W
    IIE TRANSACTIONS, 2000, 32 (11) : 1059 - 1069
  • [9] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Vanhoucke, Mario
    Debels, Dieter
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 311 - 326
  • [10] A reduction tree approach for the Discrete Time/Cost Trade-Off Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2022, 143