A GOAL PROGRAMMING-MODEL FOR PROJECT CRASHING WITH PIECEWISE LINEAR TIME COST TRADE-OFF

被引:8
|
作者
VRAT, P
KRIENGKRAIRUT, C
机构
[1] Asian Inst of Technology, Bangkok, Thail, Asian Inst of Technology, Bangkok, Thail
来源
关键词
D O I
10.1016/0167-188X(86)90037-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
INDUSTRIAL MANAGEMENT
引用
收藏
页码:161 / 172
页数:12
相关论文
共 50 条
  • [1] An Integer Grey Goal Programming For Project Time, Cost and Quality Trade-Off
    Hajiagha, Seyed Hossein Razavi
    Akrami, Hadi
    Hashemi, Shide Sadat
    Mahdiraji, Hannan Amoozad
    INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2015, 26 (01): : 93 - 100
  • [2] Presenting a goal programming model in the time-cost-quality trade-off
    Hamta, Nima
    Ehsanifar, Mohammad
    Sarikhani, Javad
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (01) : 1 - 11
  • [3] Linear programming based approaches for the discrete time/cost trade-off problem in project networks
    Hafizoglu, A. B.
    Azizoglu, M.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (04) : 676 - 685
  • [4] A crashing-based time-cost trade-off model considering quality cost and contract clauses
    Akin, Firat Dogu
    Polat, Gul
    Turkoglu, Harun
    Damci, Atilla
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 23 (06) : 954 - 963
  • [5] Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming
    Elkalla I.
    Elbeltagi E.
    El Shikh M.
    Journal of The Institution of Engineers (India): Series A, 2021, 102 (1) : 267 - 278
  • [6] Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking
    Ballesteros-Perez, Pablo
    Elamrousy, Kamel Mohamed
    Carmen Gonzalez-Cruz, Ma
    AUTOMATION IN CONSTRUCTION, 2019, 97 : 229 - 240
  • [7] A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development
    Hashemi, Reza
    Shahbandarzadeh, Hamid
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 323 - 330
  • [8] A LINEAR GOAL PROGRAMMING-MODEL FOR CLASSIFICATION WITH NONMONOTONE ATTRIBUTES
    LAM, KF
    CHOO, EU
    COMPUTERS & OPERATIONS RESEARCH, 1993, 20 (04) : 403 - 408
  • [9] A time - Cost trade-off algorithm for nonserial linear projects
    Senouci, AB
    Eldin, NN
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (01) : 134 - 149
  • [10] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186