Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study

被引:0
|
作者
Sorrentino, Mariarosa [1 ]
机构
[1] Univ Bologna, Sch Engn & Architecture, Bologna, Italy
关键词
Construction Management; Key Performance Indicators (KPIs); Time-Cost-Quality trade-off analysis; road construction; Genetic Algorithms (GAs); Multi-objective Optimization;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects must satisfy time cost and quality requirements and Project Management is basically focused on this trade-off. In fact, in every project these three parameters are interdependent: it's impossible to change an element without conditioning at least one of the other two. The paper presents the development of a practical and automated system that uses an artificial intelligence technique for the planning of an infrastructural construction work, with the aim of optimizing time-cost-quality simultaneously. The model is developed as a multi-objective genetic algorithm to provide the capability of quantifying and considering quality in construction optimization. The purpose is to provide planners a useful technique to explore all possible project configurations.
引用
收藏
页码:163 / 176
页数:14
相关论文
共 50 条
  • [42] Research on the fully fuzzy time-cost trade-off based on genetic algorithms
    Jin Chao-guang
    Ji Zhuo-shang
    Lin Yan
    Zhao Yuan-min
    Huang Zhen-dong
    Journal of Marine Science and Application, 2005, 4 (3) : 18 - 23
  • [43] A New Approach to Time-Cost-Quality Tradeoff Problem for Construction Project
    Fu Fang
    Zhang Chao
    2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1836 - 1842
  • [44] A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling
    Pawinski, Grzegorz
    Sapiecha, Krzysztof
    FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 171 - 179
  • [45] Time-cost-quality-risk Trade-off Project Scheduling Problem in Oil and Gas Construction Projects: Fuzzy Logic and Genetic Algorithm
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2022, 16 (02) : 355 - 364
  • [46] Trading off Time-Cost-Quality in Construction Project Scheduling Problems with Fuzzy SWARA-TOPSIS Approach
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    Antucheviciene, Jurgita
    Saparauskas, Jonas
    BUILDINGS, 2021, 11 (09)
  • [47] On the discrete time, cost and quality trade-off problem
    Tareghian, Hamed R.
    Taheri, Seyyed Hassan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) : 1305 - 1312
  • [48] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [49] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [50] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165